Data centre decommissioning in Mumbai and Navi Mumbai
Leaving a cage, retiring a rack row or closing a whole hall in Airoli, Mahape, Rabale, Ghansoli or Panvel? One plan for the IT kit, the drives, the UPS batteries and the cabling, with the paperwork your auditors and your colo provider will ask for.
- Servers, storage, network, UPS, racks and PDUs collected
- Every drive wiped or destroyed and listed by serial number
- Buy-back quote on reusable kit, recycling value on the rest
- Planned around your change window and building rules
Mumbai is India’s data centre capital, and capacity keeps turning over
The IT Ministry’s figures, reported by CRN Asia on 19 March 2026, put India’s data centre capacity at over 1,500 MW, with Mumbai and Navi Mumbai at 790 MW, more than half the national total (CRN Asia). New campuses keep coming: Colt DCS and RMZ started building a 64 MW facility at their Navi Mumbai campus, reported on 15 October 2026 (CRN Asia).
Every migration to a newer hall, a hyperscale cloud region or an AI-ready rack leaves something behind: an old cage, a rack row, an on-premise server room in an office tower. That is the work this page is about.
A data centre exit, step by step
- 8 to 12 weeks out: freeze the inventoryExport make, model, serial and drive count from your CMDB or asset register. Reconcile it against what is physically in the racks; ghost assets and spare drives in drawers are where data leaks start.
- 6 weeks out: decide wipe or destroy, per driveMark which drives must be physically destroyed (by policy, by customer contract or because they hold regulated data) and which can be wiped for resale. Get InfoSec to sign the list.
- 4 weeks out: clear locks and licencesRemove remote-management, BIOS and vendor locks and release licences, or the kit loses its resale value. See removing MDM, activation and BIOS locks.
- 3 weeks out: book the buildingColo providers and office towers want permits, insurance papers, named staff, loading bay slots and service-lift timings. Share them with us and we plan the pickup to fit.
- Cut-over: de-rack and collectKit is de-racked (by your team or ours, tell us which), counted against the inventory and loaded. Drive counts are checked before anything leaves the floor.
- Within 7 days: paperwork closes the jobAsset list by serial number, data destruction certificate, GST invoice where we buy, and a recycling certificate for the e-waste. Our service standard is certificates within 7 days of pickup.
What leaves a data centre, and where it should go
| Item | The risk | What we do |
|---|---|---|
| Servers and blade chassis | Drives and onboard storage still hold data | Recent kit wiped and quoted for buy-back; older kit recycled at authorised facilities |
| Storage arrays, NAS, tapes, loose drives | The highest data risk in the room | Every drive wiped or physically destroyed and logged by serial number on the certificate |
| Switches, routers, firewalls | Configs, keys and passwords in flash memory | Reset or destroyed as your policy asks; resale quote where there is a market |
| UPS systems and battery strings | Heavy, hazardous, and covered by the Battery Waste Management Rules, 2022 | Collected with the rest of the kit and sent for authorised recycling |
| Racks, PDUs, cable trays, copper and fibre cabling | Bulk and labour, often forgotten until the last day | Removed and priced on metal value |
| Precision ACs | Refrigerant and heavy units | Collected; tell us the count and access route when you enquire. For chillers, DG sets or other plant, ask us first |
The full list of what we take is on the server and data centre decommissioning service page.
The Navi Mumbai and Mumbai data centre corridor
Our own teams cover Mumbai, Thane and Navi Mumbai, which puts the whole Thane–Belapur belt within a same-day run.
Outside MMR? Tell us the location and we will check whether it can be served through authorised partners. Area pages: Navi Mumbai · Andheri East and SEEPZ · Lower Parel and Worli.
The documents your auditors will ask for
- Asset list by serial number, matched to your inventory export, with any differences flagged.
- Data destruction certificate listing every drive. What a good one contains: certificate of data destruction.
- GST invoice for anything we buy back.
- Recycling certificate for the e-waste and batteries.
For the rules behind these documents, read our long guide on data centre decommissioning compliance in India and DPDP-ready IT disposal. Choosing a vendor? Use the ITAD due diligence checklist.
On batteries: Maharashtra Pollution Control Board’s FAQ on the Battery Waste Management Rules says the rules cover all types of batteries regardless of use, and that the list of registered recyclers is available from the state boards (MPCB FAQ, PDF). This is general information, not legal advice.
Data centre exits: common questions
Can you work inside a colocation facility’s rules?
Yes. Send us the provider’s requirements (permits, insurance papers, named staff, loading bay and lift slots) when you enquire and we plan the collection to fit them and your change window.
What happens to the hard drives and SSDs?
Every drive is wiped or physically destroyed, as your policy requires, and listed by serial number on the data destruction certificate. Mark the drives that must be destroyed rather than wiped before pickup.
Will we be paid for old servers and network gear?
Recent servers and networking gear with resale life are quoted for buy-back. Older kit is priced on its recycling value. You see the quote before pickup.
Do you take the UPS batteries and the racks too?
Yes. UPS systems, battery strings, racks, PDUs and cabling are collected in the same job, so you do not need separate vendors for the IT and the power side.
How soon do we get the certificates?
Our service standard is certificates within 7 days of pickup, along with the asset list and invoice.